Space Cabin For Tower Crane

  • Space Cabin For Tower Crane
  • Space Cabin For Tower Crane
  • Space Cabin For Tower Crane
Space Cabin For Tower Crane
  • ZCJJ
  • China
  • 10days
  • 50pcs

Asuncion Tower crane service, Fuerte Olimpo Tower crane service,
Ciudad del Este Tower crane service, Pedro Juan Caballero Tower crane service,
Filadelfia Tower crane service, Coronel Oviedo Tower crane service,

Products Specification

Space Cabin For Tower Crane

tower crane cabin

tower crane cab

The cabin has operator, mobile curtain, conditioner and thermal-protective coating. With Laminated Toughened Glass and electrophoretic paint, our cabin is of better appearance and more safe. 

We could provide all kinds of cabins. Focusing on customer's experience, we will give you high quality cabin and professional service.

Space Cabin

Tower Crane Cabin

Tower Crane Cab

 

 

 

Space Cabin For Tower Crane

tower crane cabin

tower crane cab

 

Tower Crane Knowledge sharing

 

Pay attention to safe use and management, keep the occurrence of tower crane accident in its infancy
There are many causes of the tower crane accident, such as the substandard quality of the tower crane, improper operation of the tower crane driver, improper construction sequence, unreasonable, inverted and reversed, and so on.

Whatever the cause of the oversight of site safety work, as long as there is a safety accident, the consequences are not what we want to see. To keep safety incidents in the bud.
1. Before the tower crane is installed, it must first be accurately and reasonably positioned according to the plan and elevation diagram provided by the project department. It is not only necessary to make it easy to install, but also to successfully dismantle it; The wall spacing should be reasonable.

 

Space Cabin For Tower Crane

tower crane cabin

tower crane cab

 

2. The installation of multiple tower cranes should consider that there is as little interference with another tower crane within the radius of the tower crane swing.


According to the geological report provided by the project department, it is necessary to judge whether the ground endurance of the tower crane installation position meets the requirements of the manual.

 

The tower crane model does not meet the requirements. It should work out a feasible plan with the company's technical department to make pile reinforcement treatment or increase the foundation, and provide calculation basis.

Then provide the base map of the tower to the project department and construct it according to the plan.

 

Space Cabin For Tower Crane

tower crane cabin

tower crane cab

 

 

3. There must be a quality insurance policy for the steel bars and concrete on the base of the tower crane. According to the basic diagram, the reinforcement shall not be arbitrarily deleted. And shall be valid by the signatory of the supervision department.


 


After the tower crane is installed, it must be well observed, measured, recorded, and archived in order to correct the problem in time and ensure that the vertical degree of the tower crane is within 3 inches.

The conclusion of 13 articles on daily maintenance work of tower crane
The daily maintenance work of tower crane can effectively reduce the chance of tower crane accident. At the same time, we should increase the safety education and publicity of tower crane.

The user has the right and obligation to urge the operator to do the daily maintenance work of tower crane to maintain its own interests. To do a good job in daily maintenance of Tower hanging, the following should be done well, and it should be tabulated and quantified, and it must be operable:
(1) Check the brake of the institutions, which must work reliably and flexibly, and there should be no dirt on the friction surface;

 

Space Cabin For Tower Crane

tower crane cabin

tower crane cab


(2) To check all wires and cables for damage and to bandage or replace damaged parts in a timely manner;
(3) check whether the safety devices are reliable and sensitive, and never "sick" work;
(4) Check for breakage and wear on the wire ropes and replace them in a timely manner if the breakage exceeds the specified requirements
(5) to keep the whole machine clean and to clean up the debris and dirt of various institutions in a timely manner
(6) Check the amount of oil in each reducer. If it is lower than the specified height of the oil surface, it should be supplemented in a timely manner. The driving pulleys should be frequently oiled to maintain the lubrication and flexibility of the transmission;
(7) Check the tightness of each joint joint bolt and whether the weld weld is cracked
(8) Check that institutions are functioning properly and that there is no noise, and if a fault is detected, it must be resolved in a timely manner
(9) Check members for yield deformation and replace if any

Space Cabin For Tower Crane

tower crane cabin

tower crane cab


(10) Each transmission mechanism must have a shield and must not be removed at will;
(11) Regular checks of structural parts for significant corrosion;
(12) Always check structural connection bolts, welds, and structural members for damage, deformation and loosening
(13) The switch contacts for each safety device shall be operated reliably and the contact arc hole shall be polished.


 


 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right