Hoist Wire Rope For Tower Crane

  • Hoist Wire Rope For Tower Crane
  • Hoist Wire Rope For Tower Crane
  • Hoist Wire Rope For Tower Crane
Hoist Wire Rope For Tower Crane
  • ZCJJ
  • China
  • store
  • 10sets

Cape Town Tower crane Spare parts, Tshwane Tower crane Spare parts,
Bloemfontein Tower crane Spare parts, Johannesburg Tower crane Spare parts,
Port Elizabeth Tower crane Spare parts, Durban Tower crane Spare parts,

Products Specification

Hoist Wire Rope For Tower Crane

hoisting wire rope ,

Luffing wire rope ,

Trolley wire rople

Size: Diametre 7.7mm , Diametre 7.5mm, Diametre 8mm, Diametre 10mm

Diametre 12mm , Diametre 14mm, Diametre 16mm, Diametre 18mm,Diametre 20mm,Diametre 22mm,

Tower Crane

Hoist Wire Rope

trolley Wire Rope

 

 

Hoist Wire Rope For Tower Crane

hoisting wire rope ,

Luffing wire rope ,

Trolley wire rople

Size: Diametre 7.7mm , Diametre 7.5mm, Diametre 8mm, Diametre 10mm

Diametre 12mm , Diametre 14mm, Diametre 16mm, Diametre 18mm,Diametre 20mm,Diametre 22mm,

 

 Tower Crane Knowledge sharing

 

Safety operation rules of tower crane 25, welcome to consult various models price
With domestic advanced construction machinery production line, precision testing equipment, can ensure reliable quality and safety. Below, the factory according to tower crane production and use experience, summarized tower crane safety operating procedures 25.
(14) When the tower of the control room is suspended from the ground, when the abnormal command produces hardship, two commanding personnel on the high altitude and the ground may be set up, or effective contact methods such as walkie-talkies may be used to conduct the command.
(15) Safety protection devices, such as the barrel-variable amplitude brake, the walking limiter, the torque limiter, the hook height limiter and various stroke limiter switches of the tower crane must be complete and complete, sensitive and reliable, and must not be arbitrarily adjusted or removed. It is strictly forbidden to replace the holding mechanism with a limiting device.

 

 

Hoist Wire Rope For Tower Crane

hoisting wire rope ,

Luffing wire rope ,

Trolley wire rople

Size: Diametre 7.7mm , Diametre 7.5mm, Diametre 8mm, Diametre 10mm

Diametre 12mm , Diametre 14mm, Diametre 16mm, Diametre 18mm,Diametre 20mm,Diametre 22mm,


(16) No one is allowed to stay, work or pass under the lifting arm or heavy object during the tower lifting class. When lifting heavy objects, it is forbidden to pass over people. It is forbidden to carry people by tower.
(17) Tower lifting machinery must be operated according to the prescribed tower lifting function, and objects with unknown components shall not be overloaded or lifted. Under special circumstances, when overloading is required, it must be checked, there must be technical measures to ensure safety, and with the consent of the person in charge of the enterprise's technology, there must be a person in the field to supervise the lifting, but it must not exceed 10 % of the limit.
(18) It is strictly forbidden to hang heavy objects in the air for a long period of time. In case of sudden failure in operations, measures should be taken to land heavy objects in a safe place, and the motor should be closed or the power supply cut.

 In the event of a sudden power outage, all knobs should immediately be set to zero, the main power switch should be disconnected, and measures should be taken to safely lower the weight to the ground.
(19) It is strictly forbidden to use a tower crane to pull, hang and lift heavy objects that are buried underground or solidified on the ground. Concrete members or templates poured on site must be loose before they can be lifted.

 

 

Hoist Wire Rope For Tower Crane

hoisting wire rope ,

Luffing wire rope ,

Trolley wire rople

Size: Diametre 7.7mm , Diametre 7.5mm, Diametre 8mm, Diametre 10mm

Diametre 12mm , Diametre 14mm, Diametre 16mm, Diametre 18mm,Diametre 20mm,Diametre 22mm,


(20) When lifting heavy objects, they should be tied smoothly and firmly. Sporadic objects should not be piled or hung on heavy objects. Pieces of data and objects must be secured by hanging cages or wire ropes before they can be lifted. Items marked with the status or marking of the binding shall be tied according to the indicated position. The angle between the tied wire rope and the object shall not be less than 300


 


(21) In the event of strong winds or heavy rain, heavy snow, fog and other bad weather, the tower should be suspended from the open air operation. When working after rain and snow or in rain and snow, you should first go through the test crane to ensure that the brake is sensitive and reliable before operating.
(22) When the lifting load reaches 90 ° and above of the additional lifting weight of the tower, The weight should be lifted from the ground 20 to 50 cm to stop lifting and perform the following inspections: stability of the crane, reliability of the brake, stability of the weight, and firmness of the tying. After confirmation, it can be lifted continuously. For heavy objects that may be shaken, Shuanlasheng must be killed.
(23) The speed of promotion and descent of heavy objects must be average. It is forbidden to move quickly and suddenly. The left and right roll back action should be stable, when the turn does not stop before the reverse action. Non-gravity reduced tower crane, not allowed to carry free landing.
(24) The minimum distance from the top of the tower hook device to the bottom of the car frame: 1000mm at the upper rotary rate of 2 times, and 700MM at the 4 times rate; The downward rotation is 800mm at 2 times. The rate of 4 times is 400mm, which should be able to end the lifting immediately.

 

Hoist Wire Rope For Tower Crane

hoisting wire rope ,

Luffing wire rope ,

Trolley wire rople

Size: Diametre 7.7mm , Diametre 7.5mm, Diametre 8mm, Diametre 10mm

Diametre 12mm , Diametre 14mm, Diametre 16mm, Diametre 18mm,Diametre 20mm,Diametre 22mm,


(25) During the operation, when the operators are permanently separated from the operating room, they must block the power supply and lock the rail clamp. After the operation is over, the tower crane should be parked next to the track, the lifting arm should be turned to the downwind direction, and the rotary brake should be released.

The car and the equilibrium weight should be placed in non-working conditions. The hook should be raised from the top of the lifting arm 2 to 3M.

 


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right