S46J Basic Mast Tower Crane Masts

  • S46J Basic Mast Tower Crane Masts
  • S46J Basic Mast Tower Crane Masts
  • S46J Basic Mast Tower Crane Masts
S46J Basic Mast Tower Crane Masts
  • ZCJJ
  • China
  • store
  • 10sets

Brasília Tower crane rental, Sao Paulo Tower crane rental,
Foz do Iguazul Tower crane rental, Rio de Janeiro Tower crane rental,
Manaus Tower crane rental, Goiânia Tower crane rental,

Products Specification

Type , Model:

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast

Size: 1.6mx1.6mx7.5m 

Materials: Q345B

Within: Pins, bolts, Ladder, Platform

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

S46J Basic Masts

L46A1 Basic Masts

1.6m

 

 

 

 

 

 

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast

 

Tower Crane Knowledge sharing

What are the basic requirements for the safety operation technology of Tower hoist?
The tower crane operator must master a solid tower crane operation technology to avoid tower crane accidents caused by improper operation. In this article the majority of tower crane practitioners discussed, tower crane work safety operation technology basic requirements
1. Scaffolding and demolition of scaffolding can only be carried out after the construction workers(construction erection operators) have been assessed for special operations and work safety techniques at high altitudes and have obtained special operation licenses and passed medical examinations.
2. the scaffold must be strictly in accordance with the construction plan and operation rules of the special tower hanging set up, in the construction of the correct wear and use of labor protection supplies.
3. scaffolding must not be mixed with steel, bamboo, the main force rod parts, such as vertical bar, large horizontal bar, small horizontal bar and scissors support, etc., must use the same material material in the same building facade.

 

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast

 

 

4. set the tower pole should be equal distance, vertical distance should not be more than 1.8 water, scaffolding should not be more than 20 cm from the wall. If it is greater than 20 cm, isolation measures must be taken.
5. the length of the main rod of the scaffold must be staggered; The joint of the steel pipe scissors must be attached, and the length of the joint must not be less than 50 cm.
6. the top of the scaffold must be capped according to the requirements of the regulations; The vertical pole should be less than 50 cm from the cornice, and the outer pole should be 1 meter from the cornice of Gaochu.


 


On the outside of the scaffold, from the second step, 1.2 meters high protective railings and 30 meters high retaining rods must be set at each step; The top row of handrails should not be less than 2, with heights of 1.2 meters and 1.8 meters respectively.
Steel pipes and fasteners used for erection must conform to the National standards, and the use of steel pipes with severe corrosion, bending deformation or cracks is prohibited. The fasteners for brittle cracking, deformation, and sliding wires are also prohibited.
Scaffolding must be carried out in accordance with the specifications, that is, horizontal and vertical, the connection is strong, the bottom foot is really, the layers are pulled, the support is straight, smooth and flat, and the facilities are complete and firm.

 

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast


9. scaffolding inside the bar and external wall between the required protection. The ramp on the scaffolding shall have an independent support system. The rest platform at the corner shall not be less than 2 square meters, the slope of the ramp shall not be greater than l:3, and the spacing of the Anti-Slip bars shall not be greater than 30 cm.
10. the bottom of the steel pipe scaffolding pole should be vertically stable on the concrete cushion or concrete foundation, and set vertical and horizontal sweeping rod.
The rubbish and debris on the scaffolding must be cleaned up frequently. If it is found that the foot piece is broken or the rod piece is bent or deformed, it should be replaced in time.
12. strictly prohibit on the scaffolding cable wind rope and set lifting lever; Do not put the material slide on the scaffolding and set up the material receiving platform; Do not use slant pull, slant hanging from scaffold feed.
13. the scissors supporting at the ends of the frame, at the corners, and on the outside must be connected, and the structure and quantity of the tie points meet the requirements.
The distance between the scaffolding and the various transmission lines must meet the prescribed safety distance, otherwise the necessary security measures must be taken. When missing and removing the frame, you must pay attention to safety and be careful not to injure people after the rod part touches the high-voltage line.

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast


The safety protection, strength, stiffness and stability of the scaffolding with an operating surface of more than 2 meters must also meet the relevant requirements.
Scaffolding must have a good lightning proof grounding device, and the grounding resistance is not greater than that of Looumu.
17, the removal of scaffolding and material hoist should be clearly directed by a special person. Before the demolition, it is necessary to conduct a comprehensive inspection of the body or other pull material, the connection between the hoist and the scaffolding, and the building


 

S46J Basic Mast Tower Crane Masts

L46A1 Basic Masts

1.6m , 7.5m basic mast


Designated person alert when dismantled; Demolition must be carried out layer by layer according to the inverse order of the arrangement, and it must be done step by step. It is strictly forbidden to dismantle it at the same time.
Remove steel pipes, footplates, fasteners, safety nets and other objects shall be transmitted downward or suspended by a rope and shall not be thrown downward.
Steel pipes, footcuts, fasteners, safety nets, etc. are classified into categories, neatly stacked, and placed with signs.
After scaffolding is set up, it must apply for acceptance.

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right