7030 Mast Section ZOOMLION Tower Crane

  • 7030 Mast Section ZOOMLION Tower Crane
  • 7030 Mast Section ZOOMLION Tower Crane
  • 7030 Mast Section ZOOMLION Tower Crane
7030 Mast Section ZOOMLION Tower Crane
  • ZCJJ
  • China
  • 10days
  • 50sets

ZOOMLION TC6012-6 Mast section ZOOMLION TC6012-6 Anchor frame ZOOMLION TC6012-6 Fixing angle
ZOOMLION TCT7015-8E Mast section ZOOMLION TCT7015-8E Anchor frame ZOOMLION TCT7015-8E Fixing angle

Products Specification

Type , Model: 7030 Mast Section ZOOMLION Tower Crane

Size: 2M

Use for : ZOOMLION Tower Crane

Materials: Q345B

Within bolts, Ladder, Platform

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

 

ZOOMLION TC7030B

 

TC7030B Mast Section

 

 

ZOOMLION TC7035B

TC7030B Mast Section ZOOMLION 7035B Mast Section ZOOMLION Tower  Crane

 

 

 

Tower Crane Knowledge sharing:

 

Case study of anti-collision safety measures for cross operation of multiple tower cranes

Ix. Emergency rescue plan

The purpose of making emergency rescue plan is to control the development of emergency time quickly, orderly and efficiently and reduce the accident loss to the minimum.

1. Accident type and hazard degree analysis during the construction process, the possible safety accidents of special equipment are mainly reflected in the following aspects:

1) during the operation, the safety limit device suddenly loses control, breaks the rope and causes falling objects, injury or abnormal impact, and causes major dumping or arm breakage, etc.;

 

TC7030B Mast Section ZOOMLION 7035B Mast Section ZOOMLION Tower  Crane

 

2) the side of the foundation pit falls downhill under the action of external load;

3) serious damage to facilities caused by natural disasters

4) casualties occur in the process of dismantling and jacking of tower crane construction lift

5) electric equipment fault or serious power leakage occurs in the running line, causing electric shock accident

2. Basic principles of emergency response

1) better adapt to the requirements of legal and economic activities

2) to provide a better and safer environment for employees' work and residence around the construction site

3) ensure that all emergency resources are in good readiness for war

4) to guide the emergency operation to be carried out in an orderly manner according to the plan and prevent the delay of emergency rescue due to the poor organization of emergency operation or the disorder and disorder of on-site rescue work;

5) effectively avoid or reduce casualties and property losses

6) to help realize quick, orderly, efficient and fully embody the "emergency spirit" of emergency rescue.

Adhere to the policy of safety first, prevention first, environment first, and implement the principle of often unremitting, unified command, efficient coordination, continuous improvement". Protecting people's safety is a priority,  he said

3. Information of emergency service department

1) fire department fire alarm 119

2) alarm number 110 of the public security department

3) traffic department traffic accident 122

4) medical department emergency center 120

4. Responsibilities of the organization

4. 1 emergency organization system

4. 2 command structure and responsibilities

 

TC7030B Mast Section ZOOMLION 7035B Mast Section ZOOMLION Tower  Crane

 

1) determine whether there is or may be a major emergency, and request the emergency service agency to provide assistance and implement the off-site emergency plan, and conduct direct control in a place not affected by the accident;

2) review and evaluate the possible development direction of the accident (event), and determine its possible development process;

3) instruct partial shutdown of facilities, cooperate with key members of the leading team to command the evacuation of personnel on site, and ensure that any injuries can be given sufficient attention;

4) contact with off-site emergency agencies and make arrangements for handling emergencies;

5) implement traffic control in the site (facilities) and assist off-site emergency agencies to carry out service work;

6) after the end of the emergency, control the recovery of the affected sites, and organize personnel to participate in the accident analysis and treatment.

5. Prevention and early warning

5.1 hazard control establish and improve the major hazard information monitoring methods and procedures of the project, improve the identification of hazard sources, and identify and evaluate the hazard sources. In terms of technical management measures, we will strengthen the monitoring and control of major accident hazards to prevent serious and major accidents from occurring.

The project department shall clearly identify the dangerous area of the dangerous equipment to achieve standardized and standardized management.

5.2 early warning action in case of the collapse of the tower crane, the project manager at the scene shall immediately report the danger to the emergency team leader by phone.

The emergency team leader shall immediately call the operators or other members of the accident witnesses, rescue, rescue and protection team members with their own rescue tools to the scene of the accident.

 

TC7030B Mast Section ZOOMLION 7035B Mast Section ZOOMLION Tower  Crane

 

After receiving the report, the leader of the emergency team shall promptly notify all the members of the command center and report the accident to the relevant departments in the place of occurrence step by step within one hour.

The report shall include the time, place, unit, contact number, reporter, casualties and other brief information.

 

 


ZOOMLION D1100-63  Mast section ZOOMLION D1100-63 Anchor frame ZOOMLION D1100-63 Fixing angle
ZOOMLION TC5010-4  Mast section ZOOMLION D1100-63 Anchor frame ZOOMLION D1100-63 Fixing angle
ZOOMLION TC5613-6  Mast section ZOOMLION TC5613-6 Anchor frame ZOOMLION TC5613-6 Fixing angle
ZOOMLION TC6010-6 Mast section ZOOMLION TC6010-6 Anchor frame ZOOMLION TC6010-6 Fixing angle
ZOOMLION TC6013A-6  Mast section ZOOMLION TC6013A-6 Anchor frame ZOOMLION TC6013A-6 Fixing angle
ZOOMLION TC6013A-6F  Mast section ZOOMLION TC6013A-6F Anchor frame ZOOMLION TC6013A-6F Fixing angle
ZOOMLION TC6015A-10  Mast section ZOOMLION TC6015A-10 Anchor frame ZOOMLION TC6015A-10 Fixing angle
ZOOMLION TC6015A-10  Mast section ZOOMLION TC6015A-10 Anchor frame ZOOMLION TC6015A-10 Fixing angle
ZOOMLION TC6016A-8  Mast section ZOOMLION TC6016A-8 Anchor frame ZOOMLION TC6016A-8 Fixing angle
ZOOMLION TC6016A-8B  Mast section ZOOMLION TC6016A-8B Anchor frame ZOOMLION TC6016A-8B Fixing angle
ZOOMLION TC6513-6  Mast section ZOOMLION TC6513-6 Anchor frame ZOOMLION TC6513-6 Fixing angle
ZOOMLION TC6517B-10  Mast section ZOOMLION TC6517B-10 Anchor frame ZOOMLION TC6517B-10 Fixing angle
ZOOMLION TC7035B-16  Mast section ZOOMLION TC7035B-16 Anchor frame ZOOMLION TC7035B-16 Fixing angle
ZOOMLION TC7052A-25  Mast section ZOOMLION TC7052A-25 Anchor frame ZOOMLION TC7052A-25 Fixing angle
ZOOMLION TC7525-16D  Mast section ZOOMLION TC7525-16D Anchor frame ZOOMLION TC7525-16D Fixing angle
ZOOMLION H6012-6A  Mast section ZOOMLION H6012-6A Anchor frame ZOOMLION H6012-6A Fixing angle
ZOOMLION TC7030B-12  Mast section ZOOMLION TC7030B-12 Anchor frame ZOOMLION TC7030B-12 Fixing angle
ZOOMLION TC8039-25  Mast section ZOOMLION TC8039-25 Anchor frame ZOOMLION TC8039-25 Fixing angle
ZOOMLION TCT5510-6G  Mast section ZOOMLION TCT5510-6G Anchor frame ZOOMLION TCT5510-6G Fixing angle
ZOOMLION TCT7015-10E  Mast section ZOOMLION TCT7015-10E Anchor frame ZOOMLION TCT7015-10E Fixing angle
ZOOMLION TCT5010A-4  Mast section ZOOMLION TCT5010A-4 Anchor frame ZOOMLION TCT5010A-4 Fixing angle
ZOOMLION TCT5513-6/6F  Mast section ZOOMLION TCT5513-6/6F Anchor frame ZOOMLION TCT5513-6/6F Fixing angle
ZOOMLION T6513-8B  Mast section ZOOMLION T6513-8B Anchor frame ZOOMLION T6513-8B Fixing angle
ZOOMLION TCT7520-16D  Mast section ZOOMLION TCT7520-16D Anchor frame ZOOMLION TCT7520-16D Fixing angle
ZOOMLION TCT7527-20  Mast section ZOOMLION TCT7527-20 Anchor frame ZOOMLION TCT7527-20 Fixing angle
ZOOMLION T6013-6A/6B/6E/6F  Mast section ZOOMLION T6013-6A/6B/6E/6F Anchor frame ZOOMLION T6013-6A/6B/6E/6F Fixing angle
ZOOMLION T8030-25U  Mast section ZOOMLION T8030-25U Anchor frame ZOOMLION T8030-25U Fixing angle
ZOOMLION T320-16  Mast section ZOOMLION T320-16 Anchor frame ZOOMLION T320-16 Fixing angle
ZOOMLION T320-20  Mast section ZOOMLION T320-20 Anchor frame ZOOMLION T320-20 Fixing angle
ZOOMLION T630-32  Mast section ZOOMLION T630-32 Anchor frame ZOOMLION T630-32 Fixing angle
ZOOMLION T3000-160V  Mast section ZOOMLION T3000-160V Anchor frame ZOOMLION T3000-160V Fixing angle
ZOOMLION LH800-63  Mast section ZOOMLION LH800-63 Anchor frame ZOOMLION LH800-63 Fixing angle
ZOOMLION L250-16  Mast section ZOOMLION L250-16 Anchor frame ZOOMLION L250-16 Fixing angle
ZOOMLION TCR6055  Mast section ZOOMLION TCR6055 Anchor frame ZOOMLION TCR6055 Fixing angle
ZOOMLION D800-42  Mast section ZOOMLION D800-42 Anchor frame ZOOMLION D800-42 Fixing angle
ZOOMLION D1250-80  Mast section ZOOMLION D1250-80 Anchor frame ZOOMLION D1250-80 Fixing angle
ZOOMLION D1400-84  Mast section ZOOMLION D1400-84 Anchor frame ZOOMLION D1400-84 Fixing angle
ZOOMLION D2500-120  Mast section ZOOMLION D2500-120 Anchor frame ZOOMLION D2500-120 Fixing angle

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right