MCR160 Tower Crane Lease Rent Hire

  • MCR160 Tower Crane Lease Rent Hire
  • MCR160 Tower Crane Lease Rent Hire
  • MCR160 Tower Crane Lease Rent Hire
MCR160 Tower Crane Lease Rent Hire
  • Famous Global
  • Global
  • 5 to 50days
  • as u need units

Libya used Tower Crane, Sudan used Tower Crane, Tunisia used Tower Crane,

MCR160 Tower Crane Lease Rent Hire

Series , Luffing jib Crane, Topkit tower crane, Hammer head tower crane, Topless tower crane, Flat top tower crane,

Model,

Jib length,   m

Max load,   Ton

Tip load,    Ton

Type, Stationary , Inter climbing ,Travelling,

And other Famous brand, Model ,  Depend on the brand , Model Ability , Year , Height and etc u want.

We have large units store.  From 6Ton to 20Ton. Store and Service all over the world.

 

Mean time , We supply all the Spare Parts U may need as follow,

Masts Section ,  Anchor Frame, Collar ,Tie , Fixing angle , Cabin, Hoist mech. Trolley mech. Luffing Mech. Slewing Mech. Pulley and etc.

MCR160 Tower Crane

MCR160 Tower Crane

MAST SECTION

MCR160 Tower Crane Lease Rent Hire

Tower Crane Knowledge sharing:

What is the work of safety inspection before tower crane installation

Safety inspection before installation of tower crane

1. Basic inspection of tower crane specifications: check the pressure test report of concrete in the foundation, and organize the installation of tower crane after the concrete reaches the designed strength. The horizontal error of the upper surface of concrete foundation is no more than 0.5mm. Concrete foundation should be 150mm higher than the natural ground, and have good drainage measures, it is strictly prohibited to tower tower water.

MCR160 Tower Crane Lease Rent Hire

2. Carefully inspect each component of the tower crane specification itself, structural welding seam, bolt, pin shaft, guide wheel, steel wire rope, lifting hook, lifting spreader and lifting jacking hydraulic climbing system, electrical equipment, etc., and solve the problems in time.

3. Check the switch box and power supply line of tower crane to ensure safe power supply during operation. Check whether the technical performance of the machines and tools used for installation is good, check whether the safety protective equipment used for installation meets the requirements, solve the problems immediately if found, and ensure the safety of the machines, tools and equipment and safety protective equipment used for installation.

MCR160 Tower Crane Lease Rent Hire

4. The tower crane must keep the site clean and orderly during the installation process, so as not to hinder the operation and affect the safety. A warning line shall be set up in the operation area, and a special person shall be in charge of warning to prevent people irrelevant to the installation of the tower crane from entering the installation site of the tower crane.

MCR160 Tower Crane Lease Rent Hire

5. Tower crane installation must be carried out in the daytime, and should avoid rainy, windy, fog weather, such as sudden weather changes in the operation to stop the operation.

6. Those who participate in the installation and dismantling of tower cranes must be specially trained by the labor department and hold a certificate after passing the examination. Personnel participating in the installation and dismantling of tower cranes must wear a safety helmet. Personnel working at height should fasten a safety belt, wear non-slip shoes and work clothes. Unified command and coordinated actions are required during operation to prevent accidents.

7. Collision prevention measures for tower crane operation. The minimum erection distance between towers shall ensure that the minimum distance between the lower tower crane arm end and the tower body of another tower crane is not less than 2 meters, and the vertical distance between the high tower crane (lifting hook to the highest point) and the low tower crane is not less than 2 meters in any case.

MCR160 Tower Crane Lease Rent Hire

TOWER CRANE USED

LIEBHERR TOWER CRANE USED

TEREX TOWER CRANE USED

SYM TOWER CRANE USED

SCM TOWER CRANE USED

YONGMAO TOWER CRANE USED

COMEDIL TOWER CRANE USED

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right