1 (One) unit Tower Crane POTAIN MC120B, (1.6x1.6x3.0m mast, Used one, Stationary type) Brand: POTAIN (Original ) Year.: 2018 Main Characteristics - Free standing Height:44 m - Jib: 60m - Load at tip: 1.15Ton - Maximum Load: 6Ton -Mast type: L46A1 (1.6x1.6x3.0m) Mechanisms: - Hoisting: 24PC - Slewing: RCV145 - Trolley: 4D3V3 - Power supply: 380v 50Hz/440v 60Hz Included: •Electric and metal cables, complete set. •1 set of hoisting mechanism •1 set of slewing mechanism •1 set of trolleying mechanism •One set of slewing table •Without the set of complete telescoping cage (Jacking cage and hydraulic system) •12 units L46A1 (1.6x1.6x3.0m) •1 unit of 7.5m basic mast (1.6x1.6x7.5m) •1 set of fixing angle •Counter jib and 60m jib(without counter weight) •Space Cabin (with air condition) •Wire rope capacity: 400m Cable: 55m Price: Euro €29,900Ex-W , Euro €32,300FOB SHANGHAI PORT, CHINA (3*40’HQ CONTAINERS)
-
L48A1 Mast SectionDiscussion on power supply mode, protection measures and function of emergency stop button of tower crane
-
L46A1 Mast SectionWhen the tower crane is lifted, it vibrates and makes a lot of noise. What is the cause
-
26-12-2019
290HC Mast Sectionbe paid attention to in the construction of tower crane electrical system
290HC Mast Sectionbe paid attention to in the construction of tower crane electrical system
-
26-12-2019
256HC Mast Sectionconstruction ensure the safe and reliable laying of tower crane subgrade and track
256HC Mast Sectionconstruction ensure the safe and reliable laying of tower crane subgrade and track
-
154HC Mast SectionThe basic requirements of operation technology for tower crane scaffolders are briefly summarized
-
26-12-2019
132HC Mast Section the requirements for the installation method of tower crane attachment device
132HC Mast Section the requirements for the installation method of tower crane attachment device
-
L68B2 Mast Section As for the safety operation rules of heavy tower crane, the following four points are summarized
-
L68B1 Mast Section Common problems and construction technology in tower crane foundation construction
-
L68A1 Mast Section design the tower crane foundation to ensure the safe construction