Product News
1 (One) unit Tower Crane POTAIN MC120B, (1.6x1.6x3.0m mast, Used one, Stationary type) Brand: POTAIN (Original ) Year.: 2018 Main Characteristics - Free standing Height:44 m - Jib: 60m - Load at tip: 1.15Ton - Maximum Load: 6Ton -Mast type: L46A1 (1.6x1.6x3.0m) Mechanisms: - Hoisting: 24PC - Slewing: RCV145 - Trolley: 4D3V3 - Power supply: 380v 50Hz/440v 60Hz Included: •Electric and metal cables, complete set. •1 set of hoisting mechanism •1 set of slewing mechanism •1 set of trolleying mechanism •One set of slewing table •Without the set of complete telescoping cage (Jacking cage and hydraulic system) •12 units L46A1 (1.6x1.6x3.0m) •1 unit of 7.5m basic mast (1.6x1.6x7.5m) •1 set of fixing angle •Counter jib and 60m jib(without counter weight) •Space Cabin (with air condition) •Wire rope capacity: 400m Cable: 55m Price: Euro €29,900Ex-W , Euro €32,300FOB SHANGHAI PORT, CHINA (3*40’HQ CONTAINERS)
-
L48A1 Mast Section Structural analysis of hydraulic system of tower crane and steps of hydraulic jacking
-
L46A1 Mast Section Installation steps and precautions of tower crane balance arm
-
31-12-2019
L68B3 Mast Sectionthe requirements for the installation method of tower crane attachment device
L68B3 Mast Sectionthe requirements for the installation method of tower crane attachment device
-
290HC Mast Section construction ensure the safe and reliable laying of tower crane subgrade and track
-
31-12-2019
256HC Mast Section paid attention to in the construction of tower crane electrical system
256HC Mast Section paid attention to in the construction of tower crane electrical system
-
154HC Mast SectionInstallation process, steps and precautions of tower crane balance arm
-
132HC Mast Section the problem of the scale requirements for the track and foundation installation in the self inspection of the tower crane device
-
L68B2 Mast Section Characteristics and application of tower crane split reinforced concrete foundation
-
L68B1 Mast Section Operation steps and precautions for energizing tower crane
-
L68A1 Mast Section When the new tower crane is installed, how to connect and adjust the electrical equipment




