Product News
1 (One) unit Tower Crane POTAIN MC120B, (1.6x1.6x3.0m mast, Used one, Stationary type) Brand: POTAIN (Original ) Year.: 2018 Main Characteristics - Free standing Height:44 m - Jib: 60m - Load at tip: 1.15Ton - Maximum Load: 6Ton -Mast type: L46A1 (1.6x1.6x3.0m) Mechanisms: - Hoisting: 24PC - Slewing: RCV145 - Trolley: 4D3V3 - Power supply: 380v 50Hz/440v 60Hz Included: •Electric and metal cables, complete set. •1 set of hoisting mechanism •1 set of slewing mechanism •1 set of trolleying mechanism •One set of slewing table •Without the set of complete telescoping cage (Jacking cage and hydraulic system) •12 units L46A1 (1.6x1.6x3.0m) •1 unit of 7.5m basic mast (1.6x1.6x7.5m) •1 set of fixing angle •Counter jib and 60m jib(without counter weight) •Space Cabin (with air condition) •Wire rope capacity: 400m Cable: 55m Price: Euro €29,900Ex-W , Euro €32,300FOB SHANGHAI PORT, CHINA (3*40’HQ CONTAINERS)
-
06-01-2020
L48A1 Mast Section Debugging method of trolley luffing tower crane hoisting moment limiter
L48A1 Mast Section Debugging method of trolley luffing tower crane hoisting moment limiter
-
06-01-2020
L46A1 Mast Section The function of tower crane lifting height limiter and slewing limiter
L46A1 Mast Section The function of tower crane lifting height limiter and slewing limiter
-
L68B3 Mast SectionThe reason of the broken shaft of the rotary motor caused by the reverse rotation of the tower crane during the rotary positioning
-
290HC Mast Sectionchoose the right installation location of tower crane
-
256HC Mast Section Operation technology and inspection precautions of standard bolt connection of tower crane
-
03-01-2020
154HC Mast Section Reasonable arrangement and height balance coordination of tower crane position
154HC Mast Section Reasonable arrangement and height balance coordination of tower crane position
-
132HC Mast Section the preparation work before the installation of tower crane
-
03-01-2020
L68B2 Mast Section Summary of precautions during installation and disassembly of tower crane
L68B2 Mast Section Summary of precautions during installation and disassembly of tower crane
-
L68B1 Mast Sectionthe specific contents of tower crane repair and maintenance
-
03-01-2020
L68A1 Mast Section Common practice and recommended practice of track type tower crane foundation
L68A1 Mast Section Common practice and recommended practice of track type tower crane foundation




