Fixing Angles S26BS Basic Mast

  • Fixing Angles S26BS Basic Mast
  • Fixing Angles S26BS Basic Mast
  • Fixing Angles S26BS Basic Mast
Fixing Angles S26BS Basic Mast
  • ZCJJ
  • China
  • 5days
  • 20sets

Canary Islands Tower Crane
Zambia Tower Crane

Products Specification

Type , Model: Fixing Angles S26BS Basic Mast

Size: 1.2M

Use for : S24A1  S24D1  S24D2 mast section , 1.2m L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Fixing Angles S26BS

S26BS Basic

MCT85

Fixing Angles S26BS Basic Mast

Tower Crane Knowledge sharing:

What auxiliary equipment is required for tower crane installation and disassembly

Mobile crane is generally used as auxiliary equipment in the process of tower crane installation and disassembly. Mobile crane mainly includes truck crane and crawler crane.

The lifting height, amplitude, lifting weight and other performance parameters should be taken into account when selecting auxiliary lifting equipment to meet the requirements of tower crane installation and disassembly. 

Before the installation and disassembly work, the favorable working position of auxiliary hoisting equipment shall be selected according to the situation of the installation and disassembly site of the tower crane.

 

Fixing Angles S26BS Basic Mast

When the tower crane is disassembled, if the jack-up tower crane has conditions, it should lower the section by itself to make the tower crane to the lowest position, and then choose the auxiliary lifting equipment to dismantle.

Safety inspection points for installation, use and disassembly of tower crane

I. before installation

 

Fixing Angles S26BS Basic Mast

 

(1) whether the tower crane meets the market access conditions. (check the registration number)

1. The tower crane shall be prohibited to be used if it reaches the scrapping age or there are safety risks

2. Tower cranes that are outdated and eliminated shall be prohibited from use.

(ii) whether the installation and demolition units and relevant personnel have relevant qualifications and hold the relevant certificates. (search information)

1. The installation and dismantling unit shall have the lifting equipment installation engineering professional contracting qualification and the construction enterprise safety production license;

2. Installation and demolition personnel shall be qualified for installation and demolition and hold a certificate.

(3) whether the installation and demolition plan has been formulated. (check the data on site)

 

Fixing Angles S26BS Basic Mast

1. Whether there is a specific installation and disassembly scheme, which shall be approved by the chief engineer and chief supervision engineer of the user

2. Whether the basic positioning is reasonable

(1) whether the foundation is located in the superior dangerous part of the foundation slope

(2) whether there are feasible safety measures to prevent external power, and no unprotected operation is allowed if there are high voltage lines within the radius of turning

(3) whether the anti-collision measures are reasonable: whether the distance between any two tower cranes is more than 2 meters, it is strictly prohibited that the tower crane lifting boom directly collides with the standard section of the other tower crane.

Whether the tower crane that interferes with the tower crane within the turning radius of multi-tower operation has the anti-collision measures approved.

Second, the installation

(I) perform installation notification procedures, and installation without notification shall not be allowed.

(II) (2) before installation, whether the concrete strength of the foundation meets the design standard value, whether the concealed acceptance of the foundation is performed.

whether the bearing capacity of the foundation meets the requirements of the specification, and the acceptance report shall be examined by relevant departments.

(3) whether the qualification and qualification of the on-site installation unit and installation personnel are consistent with the notification procedures.

(iv) whether on-site safety and protection work and relevant personnel are in place and whether disclosure is made.

Fixing Angles S26BS Basic Mast

 

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right