L68B1 Mast Section How much wind can the Tower Crane Bear

14-11-2019

According to the standard specifications of the Tower Crane Foundation, the tower crane can work when the wind force exceeds Grade 4, according to the conclusion drawn from the experience of the construction safety supervision station and the customers of our factory However, if the tower crane is not working, it should be parked with the wind to ensure that the balance arm of the tower crane is not affected by the wind. The following are the dangers of operating tower cranes in high winds: The tower crane operated by the crane driver is more than 20 meters high, and the balance arm alone is 46 meters. Since the construction materials of the tower crane are often several tons, the poor balance of its own tower crane shaking very much. 


L68B1 Mast Section 

L68B1 mast section is the best in this fieldL68B1 Mast Section



A crane driver said that he was very worried inside, and he was always afraid that the crane would collapse. Many construction sites also asked for risky operations as usual due to tight construction schedule Open Tower Crane driver operating tower crane will feel the tower crane shaking badly, very worried about accidents. Due to the shortage of manpower, the construction site will sometimes let some workers without a license to operate the tower crane. Due to their inexperience and strong wind, these people are more likely to have accidents. Many construction site tower crane in the wind-up operation, if the site protection measures are not effective, will be more dangerous. Industry sources point out that because the tower crane has a long balance arm, the tower crane itself has been subjected to heavy construction materials, forced upwind work is very dangerous, such a huge tower crane once broken or even collapsed, the consequences can not be envisaged.



L68B1 Mast Section 

L68B1 mast section is the best in this fieldL68B1 Mast Section



Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy