L46A1 Mast Section SAFE use of tower crane cab

07-11-2019

 1. Tower Crane should be strictly checked and accepted, tower drivers, command staff, Hook workers and electricians to hold a license to post, professional training and education in safe operation, strict post responsibility system.


 2. The tower driver and the commander of the safety technology, Tower Crane slewing Hook Height must be 6 meters above the high-voltage line. After the completion of the work, Hook, wire rope recovery position must be in the high-voltage line above 6 meters.


3. Tower Crane shall minimize crane operation on the east side of the building. Install a red warning light on the east side of the building to alert tower drivers to safety. 


4. The top of the tower crane cab is equipped with high-voltage insulation pad, all electrical equipment to maintain good insulation and installation of leakage protector.