L46A1 Mast Section Management System for tower crane drivers, drivers and commanders

22-11-2019

Management System for tower crane drivers, drivers and commanders. 1. Personnel Quality and ability is the key to ensure the safe operation of the tower crane. The Tower Crane operators must hold valid operation certificate and obtain the re-training post certificate issued by the provincial construction department before they can operate independently. It is strictly forbidden to work without a license. 


L46A1 Mast Section

L46A1 mast section is the best in this fieldL46A1 Mast Section


2. Regularly organize the training and assessment of drivers, commanders and drivers, so that they can master the performance and working principles of tower cranes, operators who are not competent for their posts should be cleared away in time. 3. Strict implementation of fixed personnel, fixed machine, fixed post three custom system, so that special command, special operation, special division of cable, without the consent of the mechanical manager, not private changing of the guard. The radio channels used by tower cranes 1 # and 2 # must be identified and locked, and the operators have no right to change the channels. In the command process, the answering mechanism is strictly implemented, that is, the operator calls the tower crane before the operator issues the action order, and the operator can only issue the action order after the operator responds. Command Password must be concise and clear, in the tower crane security technology to be unified command password. The commander must look around the working state of the Tower Crane and issue the working instruction. The Tower Crane should signal to the tower crane before entering the cross working area and enter the low speed operation in an orderly manner. 4. The implementation of the Tower Crane Shift System, the implementation of pre-shift inspection system, the implementation of post-operation records system, strictly prohibited Tower Crane Disease Operations. 5. The working time of tower crane drivers shall not exceed 10 hours per day, and fatigue work is strictly prohibited. If the working environment temperature exceeds 35 degrees Celsius in summer, need to be equipped with anti-heatstroke drugs, and equipped with electric fans in the cab to prevent heat stroke. 6. The mechanical manager should implement the safety technical disclosure system to the operators on a regular basis, and the content of the disclosure must be Operability and targeted. Kill. Strict implementation of the ten-fold non-lifting system, that is, 1 overload non-lifting; 2 slanting pull non-lifting; 3 Command Signal non-clear non-lifting; 4 Safety Device Failure non-lifting; 5 heavy objects over the head not lifting; 6 light is not clear or not lifting; 7 buried objects not lifting; 8 lifting objects on the platform not lifting; 9 binding not firm not lifting; 10 heavy objects edge sharp without protection measures not lifting. 8. Improve the reporting and inspection system. Check and report the problems and hidden troubles in time and arrange the maintenance time reasonably to ensure the tower crane is always in good condition. Strictly implement the safety check system of Safety Operation Disclosure and Group Tower Operation Plan (handover check, weekly check, monthly check, etc.) .

L46A1 Mast Section

L46A1 mast section is the best in this field

L46A1 Mast Section

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy