256HC Mast Section What technical data and safety data should the tower crane at the construction site have?

16-12-2019

Tower crane is a large mechanical equipment. There are strict audit procedures for the installation, disassembly and use of tower crane. Therefore, the tower crane on the construction site must have complete technical data and safety data before construction. According to the requirements, the tower crane construction machinery factory (http://www.fx68.net) sorts out the general tower crane data as follows:


256HC Mast Section:

http://www.towercranesupply.com/product/256hc-mast-section-liebherr-tower-crane256HC Mast Section




(1) tower crane production license, factory certificate, operation instruction, equipment file, operation and maintenance record, installation and removal plan, acceptance certificate, inspection report.




(2) qualification certificate of disassembly team, operation certificate and safety work certificate of equipment installation and disassembly personnel, commander, operator and other special operators.



256HC Mast Section:

http://www.towercranesupply.com/product/256hc-mast-section-liebherr-tower-crane



(3) the tower crane shall be hung with load limit sign, safety warning sign, operation procedure sign, acceptance pass sign and fixed person and machine sign.




According to the relevant regulations and standards, the majority of employees must strictly implement the tower crane installation and acceptance management, implement all work, strictly check and standardize the management and form a system, put an end to the occurrence of tower crane accidents, and improve the safety production level to a new level.

256HC Mast Section:

http://www.towercranesupply.com/product/256hc-mast-section-liebherr-tower-crane

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy