Anchor Frame Collar 1.2m For S24D1 Mast

  • Anchor Frame Collar 1.2m For S24D1 Mast
  • Anchor Frame Collar 1.2m For S24D1 Mast
  • Anchor Frame Collar 1.2m For S24D1 Mast
Anchor Frame Collar 1.2m For S24D1 Mast
  • ZCJJ
  • China
  • 5 to 30days
  • 50 to 200 pcs, sets

Nepal Tower Crane , Bhutan Tower Crane, Bangladesh Tower Crane

Products Specification

Type , Model: Anchor Frame Collar 1.2m For S24D1 Mast

Size: 1.2m for 1.2M L type mast

Materials: Q345B

Process: Blasting derusting, 

Painting:  Under painting , Middle painting, Surface painting.

Our factory produce and supply almost all famous brand tower crane :Mast section, Anchor Frame, Fixing angle ,Adaptor and so on as good quality and price.

Anchor Frame 1.2m S24D1

Collar S24D1 Mast

MC

Anchor Frame Collar 1.2m For S24D1 Mast

Tower Crane Knowledge sharing:

ensure the safety of tower crane construction site

How to ensure the safety of tower crane construction site? Tower crane is a large machinery, before the use of security measures must be done to avoid accidents. My factory summarized the following regulation, welcome everybody complement.

 Anchor Frame Collar 1.2m For S24D1 Mast

 

1. Safety helmet must be worn when entering the construction site. Operation after drinking is strictly prohibited.

2. Construction personnel shall be provided with admission education.

3. The construction personnel are strictly prohibited to play on the site.

4. Earthwork excavation shall be carried out in the prescribed sequence, and the operation method of hollowing out the bottom Angle shall be prohibited.

5. Underground pipelines and cables encountered in earthwork excavation must be reported in a timely manner, and construction can only continue after verification and treatment by relevant personnel.

Anchor Frame Collar 1.2m For S24D1 Mast

6. excavation machinery to comply with the mechanical safety operation procedures, mechanical safety devices complete and effective

7. before the use of mechanical excavation, to send a signal. When working in the trench, the personnel who cooperate with the excavator should pay attention to safety. No one is allowed to enter the working area of the excavator. When the excavator driver leaves the cab, he must lower the bucket to the ground.

8. Electric leakage protection device must be installed when using electric tools, and insulation performance should be checked before use to prevent electric shock accidents.

9. the welder should be separately set the switch, do zero, earthing protection shell, a line length should be less than 5 m, second line length should be less than 30 m, firm pressure on both sides of the wiring and installation, reliable shield, holder line should be double in place, must not use metal pipe, scaffolding and structure reinforcement loop ground, holder line without damage, good insulation.

10. Safety production management system board shall be set up at the construction site, and safety warning board shall be hung around the foundation pit. And set up two body railing at the edge of the slot, and set red signal light at night in dangerous places.

Anchor Frame Collar 1.2m For S24D1 Mast

 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right